Realizations from 1999 to 2002
Period
Customer
Realizations
1999 to 2001 SOSETRA
Bel Air Dakar
Fabrication and erection of a shed of 20 000 m2 and installation of machinery for foundry and rolling mill in MBAO
SOGEPAL
Rue 7 ZI Dakar
Building of a plant of Biscuit factory km 4.5 Boulevard of the centenary of the Village of Dakar and supply and erection of a shed of 20 000 m2

2001 to 2002 CCS
Malick Sy Avenue -DAKAR
Construction of a Building for Warehouses, Basement + ground floor + 6 Floors of 22 000 m2 of cover area Including 405 Piles of 500 and 650 mm diameters and 16.50 meter deep.
Realizations from 2003 to 2004
Period
Customer
Realizations
2003 Industrie chimique du Senegal
Dakar
Construction of skirt wall for a storage tank at ICS Mbao.

2003 Cement de Mauritanie
Tambacounda
Construction 75TPH cement grinding unit at Nouakchott, including, Piles, civil work, supply and erection of steel structure, erection and commissioning of mechanical equipments.



2003 to 2004 Immeuble aux 4 vents
Bel Air -Dakar
Construction of commercial building Basement+ground floor+ three floors on turn key basis.
2003 to 2004 Projet agroforestier de lutte contre la désertification
Diourbel

Drilling of 19 bore well in the region of Diourbel - Senegal
Realizations from 2005 to 2006
Period
Customer
Realizations
2005 Comptoir commercial Mandiaye Ndiaye
Dakar
Design, supply and construction of 8500m2 storage hanger, including all the civil and earth work.


2005 PNIR
Tambacounda
Drilling of 7 bore well and other infrastructure and supply of hand pump India mark II.

2006 Résidence lacoste
Dakar
Work of demolition and re-habilitation of old building in the heart of city


2006 Projet Agroforestier de lutte contre la désertification
Diourbel
Realization of 15 km of adduction in drinking water and a catchment basin in the region of Diourbel - Senegal
2005 to 2006 BSA Cement
Nouakchott
Construction of 80 TPH cement grinding unit complete with pilling, civil work, supply and erection of steel structure and erection and commissioning of mechanical equipment.
Realizations from 2007 to 2009
Period
Customer
Realizations
2007-2008 Office Nationale d'assainissement du Sénégal
Dakar
Sewage system for city of LOUGA and construction and commissioning of Sewage treatment plant.


2007-2008 HARSTAND SENEGAL SA
Dakar
construction of the Building PARADISE ROCK - Earthwork - Moulded Walls of protection - special Foundations
2007 Atelier de rénovation technique ( BIA SENEGAL)
Dakar
Realization of the civil engineering of a Workshop and a Training centre in MBAO
2007-2008 Immeuble Acile Center 
Dakar
Construction of residential and commercial building basement + Ground Floor + 6 floors
2007 Direction de l'hydraulique
Matam
Realization of 4 bore well and 2 Piézomètres in the localities of the Axle Notto-Ndiosmone-Palmarin
2007-2008 Immeuble S.A.I.M NONI
Dakar
Construction of residential &commercial Building in down town, basement + Ground Floor + 8 floors

2007 Compagnie Sucrière Sénégalaise
Matam
Pilling and civil foundation work for  distillery in sugar mill at Richard Toll.

2007 S.C.I LOUNAKE
SENEGAL
Construction of residential building  basement + G.F + 1 floor
2007-2008 Foncière côte d'Afrique 
Rufisque
Construction of building consisting of 4 twinned villas RESIDENCE ATHENEE BASEMENT common + G.F + 1 floor
2008 SOCOCIM INDUSTERIES
Dakar
Construction of civil work (LOT B SOCOFA 1485) for 1MTPA clinker unit-5

2008 Agronomes Vétérinaires Sans Frontières
Matam
Realization of 1 bore well in the region of MATAM

2008 PRODAM II
Matam
Realization of 2 deep boring in the region of MATAM
2008 Arcelor Mittal Mining Sénégal
Dakar
Construction of 27 km of lane NAFADJI and BOFETO , Construction  of a 30mtr long bridge in BOFETO over a river Realization of 11 Boring equipped with pumps



Realizations from 2009 to 2010
Period
Customer
Realizations
2009-2010 CCS YOFF 
Dakar
Construction of 2 buildings with commercial usage Basement + RDC + Mezzanine + 6 Floors, on the road of the Airport - YOFF


2009 MOUSSA KHAZEN SHAHARA 
Dakar
Construction of commercial building, basement + G.F + 6 floors
2009 IPC MBAO
Construction of 6600 sq mtr hanger with office block at Mbao.
2009-2010 CSS Richard Toll
Construction of civil work 20MW power plant.
2009 SOCOCIM Industries
Rufisque
Erection of steel structure and mechanical equipment for 1million TPA new clinker unit for SOCOCIM( SOCOFA ,1485-  Lot A + Lot B) including complete Refractory and insulation work.
2009 Direction de l'hydraulique 
Dakar
Realization of 10 deep bore well in the regions of Thies and Louga

2009 Direction de la gestion et de la planification des ressources en eau 
Matam
Realization of 04 piézomètres in the regions of Thies and Louga


2009 Direction de la gestion et de la planification des ressources en eau 
Dakar
Realization of 03 piézomètres and rehabilitation of 10 piézomètres in the regions of Diourbel, Kaolack, Matam, Tambacounda, Kolda and Dakar

 

 

 